39 lines
1.2 KiB
Markdown
39 lines
1.2 KiB
Markdown
# Workflow
|
|
|
|
- branch per issue from `next`
|
|
- do the work in Next Step
|
|
- delete Next Step from `TODO.md`
|
|
- `TODO.md` merges with git's union merge (`.gitattributes`), which never
|
|
reports a conflict: read the merged entries after every merge or rebase
|
|
- move the top item of Future Steps into Next Step
|
|
- commit (`TODO.md` changes in the same commit as the work)
|
|
- open a PR based on `next`
|
|
- an independent reviewer who did not write the change gates it
|
|
- the manager squash-merges the PR into `next` once review passes
|
|
- `next` stays green and mergeable to `main` at any time; only the owner merges
|
|
`next` into `main`, via the single milestone PR
|
|
- push
|
|
|
|
# Status
|
|
|
|
pre-1.0. The `1.0.0` milestone is in progress.
|
|
|
|
# Next Step
|
|
|
|
P2: security: per-origin rate limiting
|
|
|
|
# Future Steps
|
|
|
|
- P2: HTTP response handling
|
|
- Last-Modified headers
|
|
- P2: operational
|
|
- Prometheus metrics still missing:
|
|
- cache hits and misses, split into source images and variants
|
|
- cache size on disk and its limit
|
|
- evictions and the bytes they free
|
|
- upstream fetch duration and errors
|
|
- transcode duration
|
|
- images in processing
|
|
- measure the 1k to 5k req/s target with `script/loadtest` on a machine not
|
|
shared with other work
|