check / check (push) Canceled after 0s
Five prefix handler tests gave HandleMessage two seconds to apply a full batch of 25,000 prefixes. Under the race detector on a loaded host that takes longer, so they failed although nothing waited. A test now waits up to stepTimeout, 15 seconds, for each step it expects. The slowest tests filled production limits: 500,000 paths in the peering handler, and 30,000 table changes or 250,000 updates in the prefix handler. The handlers' unexported constructors now take these limits, as they take their timer interval, and those tests give small ones. This also fixes #215. The test helpers bound every wait, Stop included, so a test that hangs in one fails with its own message. Model: opus-5-5