check / check (push) Waiting to run
Remove the Completed Steps log, the history in the Status section and the finished Future Steps items. Status keeps the current state only. The Prometheus item names the metrics still missing. The Workflow says to delete Next Step from TODO.md instead of moving it to Completed Steps. Model: opus-5-5
39 lines
1.2 KiB
Markdown
39 lines
1.2 KiB
Markdown
# Workflow
|
|
|
|
- branch per issue from `next`
|
|
- do the work in Next Step
|
|
- delete Next Step from `TODO.md`
|
|
- `TODO.md` merges with git's union merge (`.gitattributes`), which never
|
|
reports a conflict: read the merged entries after every merge or rebase
|
|
- move the top item of Future Steps into Next Step
|
|
- commit (`TODO.md` changes in the same commit as the work)
|
|
- open a PR based on `next`
|
|
- an independent reviewer who did not write the change gates it
|
|
- the manager squash-merges the PR into `next` once review passes
|
|
- `next` stays green and mergeable to `main` at any time; only the owner merges
|
|
`next` into `main`, via the single milestone PR
|
|
- push
|
|
|
|
# Status
|
|
|
|
pre-1.0. The `1.0.0` milestone is in progress.
|
|
|
|
# Next Step
|
|
|
|
P2: security: per-origin rate limiting
|
|
|
|
# Future Steps
|
|
|
|
- P2: HTTP response handling
|
|
- Last-Modified headers
|
|
- P2: operational
|
|
- Prometheus metrics still missing:
|
|
- cache hits and misses, split into source images and variants
|
|
- cache size on disk and its limit
|
|
- evictions and the bytes they free
|
|
- upstream fetch duration and errors
|
|
- transcode duration
|
|
- images in processing
|
|
- measure the 1k to 5k req/s target with `script/loadtest` on a machine not
|
|
shared with other work
|