Files
pixa/TODO.md
T
sneak bcc5ee5c1b
check / check (push) Canceled after 0s
Keep only open work in TODO.md (closes #348)
Remove the Completed Steps log, the history in the Status section and
the finished Future Steps items. Status keeps the current state only.
The Workflow says to delete Next Step from TODO.md instead of moving it
to Completed Steps. README no longer points at the load-test
measurement that lived in the log.

Model: opus-5-5
2026-11-11 09:39:43 +00:00

970 B

Workflow

  • branch per issue from next
  • do the work in Next Step
  • delete Next Step from TODO.md
  • TODO.md merges with git's union merge (.gitattributes), which never reports a conflict: read the merged entries after every merge or rebase
  • move the top item of Future Steps into Next Step
  • commit (TODO.md changes in the same commit as the work)
  • open a PR based on next
  • an independent reviewer who did not write the change gates it
  • the manager squash-merges the PR into next once review passes
  • next stays green and mergeable to main at any time; only the owner merges next into main, via the single milestone PR
  • push

Status

pre-1.0. The 1.0.0 milestone is in progress.

Next Step

P2: security: per-origin rate limiting

Future Steps

  • P2: HTTP response handling
    • Last-Modified headers
  • P2: operational
    • measure the 1k to 5k req/s target with script/loadtest on a machine not shared with other work