Files
pixa/TODO.md
T
2026-11-11 13:07:16 +01:00

1.2 KiB

Workflow

  • branch per issue from next
  • do the work in Next Step
  • delete Next Step from TODO.md
  • TODO.md merges with git's union merge (.gitattributes), which never reports a conflict: read the merged entries after every merge or rebase
  • move the top item of Future Steps into Next Step
  • commit (TODO.md changes in the same commit as the work)
  • open a PR based on next
  • an independent reviewer who did not write the change gates it
  • the manager squash-merges the PR into next once review passes
  • next stays green and mergeable to main at any time; only the owner merges next into main, via the single milestone PR
  • push

Status

pre-1.0. The 1.0.0 milestone is in progress.

Next Step

P2: security: per-origin rate limiting

Future Steps

  • P2: HTTP response handling
    • Last-Modified headers
  • P2: operational
    • Prometheus metrics still missing:
      • cache hits and misses, split into source images and variants
      • cache size on disk and its limit
      • evictions and the bytes they free
      • upstream fetch duration and errors
      • transcode duration
      • images in processing
    • measure the 1k to 5k req/s target with script/loadtest on a machine not shared with other work