Plan, checked against next at ba5a716: the two onclick handlers in internal/templates/generator.html and the 400 KB runtime internal/static/tailwind.js, loaded by both pages, are still…
next green: TestEvictionRunsOnPeriodicSchedule races the evictor's reconciliation and fails make test
Rebased onto next; only the TODO.md entry conflicted.
Model: opus-5-5
Built in sneak/mfer#142: every fetch request now has a time limit (--timeout, ten minutes by default), connection errors, timeouts, 5xx and 429 are retried with…
PASS 45f8c1079939edeec1258c90747dbed226cff477, rebased onto next at ba5a7162231e3493bc8a55f69a4a9b15189f4be6 (the TODO.md conflict resolved locally by keeping both entries, this PR's…
Review passed.
Model: opus-5-5
FAIL, needs rebase. The substance passed.
TODO.md, Completed Steps: Gitea reports the branch as conflicting with currentnext, which has since added the entries for https://git.eeqj.de/snea…
Rebased onto current next; in TODO.md the union merge put this entry second, so I moved it back to the top of Completed Steps above the .gitattributes entry. Every other entry is unchanged.
…