Files
routewatch/TODO.md
T
sneak cddae7fd68
check / check (push) Successful in 5m57s
Drop the work log from TODO.md; keep only open work (closes #255)
TODO.md held a dated log of finished steps, merge history and accounts
of earlier live-feed runs. It now holds the Status line, the open Next
Step and an empty Future Steps. README "TODO" no longer says the file
lists the steps done.

Model: opus-5-5
2026-11-11 00:09:15 +00:00

34 lines
1.1 KiB
Markdown

# Workflow
- branch (from `main`)
- do the work in Next Step
- move Next Step to the top of Completed Steps
- move the top item of Future Steps into Next Step
- commit (`TODO.md` changes in the same commit as the work)
- merge to `main` if the branch is not protected, otherwise open a PR
- push
# Status
RouteWatch is pre-1.0. The order of the remaining work is kept on
https://git.eeqj.de/sneak/routewatch/issues/86.
# Next Step
Post the outcome of the run of `e58c663` on the live feed on
https://git.eeqj.de/sneak/routewatch/issues/232. The run began at 09:19 UTC on
2026-11-10 and lasts at least 24 hours. If the feed has not stalled or
reconnected by then, the run goes on until it does, up to 72 hours in all. The
outcome says:
- whether the feed stalled or reconnected
- whether any handler dropped an update, and the most messages the prefix
handler's queue held at once
- the most messages the prefix handler held back at once
- the size of the `origin_changes` table on disk
- the process's peak memory against 5 GiB
File an issue for each problem the run finds.
# Future Steps