Files
netwatch/TODO.md
clawbot 1e290a63cf
All checks were successful
check / check (push) Successful in 38s
test: automated responsive-layout harness (closes #13)
Verifies the mobile layout from #5 with a real browser engine instead of
by hand on a phone. make frontend-viewport-test builds dist/, serves it
from the same digest-pinned nginx image and the same nginx.conf the
shipping container uses, and drives a digest-pinned headless Chrome
against it over CDP.

Viewport widths are derived from the app's own CSS rather than from a
list of phone models: the @media conditions in src/styles.css and any
Tailwind responsive prefixes in the markup are parsed, and each
breakpoint is tested one pixel below, exactly on, and one pixel above.
max-width: 768px matches at 768, and a generic 375px test sails past
that boundary entirely. Four anchor viewports are added with stated
reasons: a 320px floor, a desktop baseline, and two phone-landscape
sizes straddling the breakpoint.

Assertions are on computed layout, not screenshots: horizontal overflow,
elements past the viewport edge, clipped text (deliberate ellipsis
truncation excluded), 44x44 minimum tap targets, and genuine reflow of
the host rows checked on both flex-direction and geometry. Probing and
gateway detection are asserted to still run at narrow widths, since the
early-return mobile path rejected in #8 is what would silently regress.
Screenshots are written to tmp/viewport/ as artifacts alongside the
results, not as the evidence.

puppeteer-core rather than playwright: it is the one variant of either
that never downloads or bundles a browser, so the browser stays a
digest-pinned image and the npm side is pinned by yarn.lock integrity.

The browser container runs on an --internal docker network with no route
off the host; the harness answers the app's latency probes itself from a
fixed delay table so the rows render a realistic spread of value widths.

Kept out of make check: it needs Docker and takes minutes, where make
test has to stay under 20 seconds.

The harness was observed failing before being trusted, twice: a planted
900px fixed-width element in a host row, and the mobile reflow rule
neutered. Both reverted.

Against the current layout it reports two real defects, filed as #42
(horizontal overflow at 320px) and #43 (tap targets below 44x44).
2026-08-09 14:52:52 +00:00

55 lines
2.4 KiB
Markdown

# Workflow
- branch (from `main`)
- do the work in Next Step
- move Next Step to the top of Completed Steps
- move the top item of Future Steps into Next Step
- commit (`TODO.md` changes in the same commit as the work)
- merge to `main` if the branch is not protected, otherwise open a PR
- push
# Status
pre-1.0. No git tags. Backend work in flight on feat/reportbuf-storage (dirty:
src/main.js). Frontend is functional; backend is new and unmerged.
# Next Step
Land feat/reportbuf-storage: finish the in-progress src/main.js change, get make
check green, and merge the branch to main. The branch adds the backend (buffered
zstd-compressed report storage), the CI workflow, and backend repo standard
files, so merging it also closes most compliance gaps.
# Completed Steps
- 2026-08-09: automated responsive-layout harness
(`make frontend-viewport-test`): digest-pinned headless Chrome driven over CDP
against the built `dist/`, viewport widths derived from the breakpoints in
`src/styles.css` (#13). Found two real layout defects, filed as #42 and #43
- 2026-07-07 Adopted scripts-to-rule-them-all: `script/` entrypoints, Makefile
shims, README Entrypoints section
- 2026-02-27: backend with buffered zstd-compressed report storage; CI workflow
and backend repo standard files; backend Dockerfile fixed (Go 1.25,
golangci-lint) and moved to repo root (feat/reportbuf-storage, unmerged)
- 2026-02-26: host row layout redesigned with CSS grid; overflow and spacing
fixes; nginx config extracted; port hardcoded to 8080
- 2026-02-26: debug log panel, median stats, recovery probe, Docker build fix,
S3 Singapore endpoint added
- 2026-02-23: summary box redesign, host pinning, local and UTC clocks, checks
counter
- 2026-02-23: hosts sorted by latency; GET instead of HEAD for latency; timeout
derived from interval; Hetzner regional endpoints; 3s interval
- 2026-01-29: initial NetWatch network latency monitor
# Future Steps
- Fix the two layout defects the viewport harness found (#42 horizontal overflow
at 320px, #43 tap targets below 44x44), then wire
`script/frontend-viewport-test` into CI as its own step
- Compliance top-up as one small commit: add .editorconfig and add the hooks
target to the Makefile
- After merge, confirm .gitea/workflows/check.yml is on main and CI is green
(main always green policy)
- Decide what to do with untracked resume.sh: commit it, gitignore it, or delete
it