Some checks failed
check / check (push) Has been cancelled
verifySignedTx compared only from, to, value and data, so a signed transaction could differ from the approval in chain id, nonce, gas limit or any fee field and still be broadcast. It now compares every consequential field and refuses outright on any mismatch: the chain id against the selected network (and against the approval when the page fixed one), plus nonce, gas limit, gasPrice, maxFeePerGas and maxPriorityFeePerGas wherever the approval carries a value, together with the fee mechanism the approval implies. Fields the approval does not carry are populated locally by the popup and have no approved value to compare against, so they are held to absolute ceilings instead. A failed signing attempt also left a button that could not succeed: the background deleted the approval before it broadcast, so a retry found nothing to sign. The approval is now retired only once the request has an outcome, and the background tells the popup whether the failure is retryable, so the button comes back for a failure the user can correct and stays down with an explanation when the approval is spent.
117 lines
6.1 KiB
Markdown
117 lines
6.1 KiB
Markdown
# Workflow
|
|
|
|
- `git pull` `next` and cut a branch from it — one branch per issue, named
|
|
`issue-<N>-<slug>`. Never branch from `main`.
|
|
- Do the work as one commit whose title ends with ` (closes #N)`, with the
|
|
`TODO.md` update in that same commit.
|
|
- Move Next Step to the top of Completed Steps; move the top item of Future
|
|
Steps into Next Step.
|
|
- Run `make fmt`, then `make check`. A feature branch may be red; `next` and
|
|
`main` may not.
|
|
- Rebase onto current `next` immediately before pushing — other branches land on
|
|
`next` continuously — and re-run `make check` after resolving, because a clean
|
|
textual merge can still break the build.
|
|
- Push the branch and open one PR per issue with base `next`. Never base `main`.
|
|
- An independent reviewer who did not write the change gates the merge. On a
|
|
passed review the PR is squash-merged into `next`.
|
|
- `next` is the branch for the next milestone. It is kept green and mergeable to
|
|
`main` at any moment, without notice.
|
|
- `main` receives exactly one PR per milestone, from `next`. Releases are tagged
|
|
from `main`.
|
|
|
|
# Status
|
|
|
|
pre-1.0, working towards the 1.0.0 milestone. Tagged v0.1.0 on 2026-02-27. The
|
|
milestone is in flight on `next`; its `next` -> `main` PR is
|
|
[#190](https://git.eeqj.de/sneak/AutistMask/pulls/190). `make check` verified
|
|
green on `next` at `e9fa8be` on 2026-08-10, and `make build` produces
|
|
`dist/chrome/` and `dist/firefox/` with every bundle verified to have `DEBUG`
|
|
compiled off.
|
|
|
|
The backlog lives on the
|
|
[Gitea tracker](https://git.eeqj.de/sneak/AutistMask/issues), which is
|
|
authoritative; this file does not duplicate it. Full policy file set present. A
|
|
real-browser end-to-end suite (`make test-e2e`) now sits alongside `make check`,
|
|
which cannot see a runtime `ReferenceError` in a popup view.
|
|
|
|
# Next Step
|
|
|
|
Land [#152](https://git.eeqj.de/sneak/AutistMask/issues/152): add ESLint to
|
|
`script/lint`. `make check` is `prettier --check` only today and cannot catch
|
|
undefined identifiers, which is how
|
|
[#150](https://git.eeqj.de/sneak/AutistMask/issues/150) and
|
|
[#151](https://git.eeqj.de/sneak/AutistMask/issues/151) shipped.
|
|
|
|
# Completed Steps
|
|
|
|
- 2026-08-11: Approval verification extended to every consequential field —
|
|
chain id against the selected network, nonce, gas limit, both EIP-1559 fees
|
|
and the legacy gas price — with a failed signing attempt made retryable
|
|
instead of leaving a dead button
|
|
([#174](https://git.eeqj.de/sneak/AutistMask/issues/174)).
|
|
- 2026-08-11: Wallet deletion repairs its own state — `hasWallet` follows the
|
|
remaining wallets, the selection only moves when it was deleted, and the
|
|
active-address change is broadcast to connected sites
|
|
([#156](https://git.eeqj.de/sneak/AutistMask/issues/156)).
|
|
- 2026-08-11: `TODO.md` Workflow rewritten to the branch-and-PR-per-issue model
|
|
on `next`, with Status and Next Step refreshed
|
|
([#191](https://git.eeqj.de/sneak/AutistMask/issues/191)).
|
|
- 2026-08-09: `DEBUG` became a build-time constant defaulting to off, injected
|
|
as the `__BUILD_DEBUG__` esbuild define and turned on with
|
|
`AUTISTMASK_DEBUG=1`, so a plain `make build` no longer hands every newly
|
|
created wallet the publicly committed test recovery phrase
|
|
([#149](https://git.eeqj.de/sneak/AutistMask/issues/149)).
|
|
- 2026-08-09: dApp approval signing moved into the popup — the password no
|
|
longer crosses the extension messaging boundary; the background broadcasts and
|
|
resolves approvals only, and verifies the signed artifact against the approval
|
|
it holds (#157).
|
|
- 2026-08-09: Post-build assertion that every emitted bundle containing
|
|
`constants.js` has `DEBUG` compiled off, via `script/verify-build` on the
|
|
`make build` path (#170).
|
|
- 2026-08-09: Containerized Chrome end-to-end harness (`make test-e2e` /
|
|
`script/test-e2e`) driving the real popup with all network intercepted, plus
|
|
the two used-but-not-imported crashes it caught: AddToken unreachable (#150)
|
|
and TransactionDetail broken for every ERC-20 transfer (#151). Harness
|
|
demonstrated failing before the fixes and passing after (#181). Interception
|
|
covers the MV3 background service worker, not just the popup page, and a
|
|
launch-time canary aborts the suite if worker traffic starts escaping.
|
|
- 2026-08-09: Reviewed the repo end to end and filed the 1.0.0 backlog
|
|
(#149-#168).
|
|
- 2026-08-09: Test coverage for the address-poisoning defense in
|
|
`src/shared/transactions.js` (#160)
|
|
- 2026-07-26: About well in settings with build info, repo link and the version
|
|
click easter egg (#145); proper view navigation stack (#146).
|
|
- 2026-07-07 Adopted scripts-to-rule-them-all: `script/` entrypoints, Makefile
|
|
shims, README Entrypoints section (#148)
|
|
- 2026-03-01: USD display suppressed on testnets (#142); estimated USD for ETH
|
|
in approve-tx view (#141).
|
|
- Sepolia testnet support (#137); etherscan links go to token-specific URLs
|
|
(#136).
|
|
- Transaction detail improvements: Type field and on-chain details (#130),
|
|
txid-first reordering (#133), swap display corrections (#128), expanded
|
|
confirm-tx warnings (#118).
|
|
- Dark mode theme setting (Light/Dark/System) with contrast fixes (#126);
|
|
timestamps include timezone offset (#120); layout shift audit, reserved space
|
|
for error messages (#124).
|
|
- Copy-flash visual feedback with timing tune (#113, #121); cross-wallet-type
|
|
duplicate detection (#115).
|
|
- 2026-02-27: v0.1.0 tagged.
|
|
- 2026-02-24: Initial scaffolding: popup UI, BIP-39 wallet creation via
|
|
ethers.js, wallet persistence, real ETH balances over RPC, ENS forward and
|
|
reverse resolution.
|
|
|
|
# Future Steps
|
|
|
|
Only work that has no issue of its own belongs here; everything else is on the
|
|
tracker.
|
|
|
|
- Pre-1.0 security review of the extension (key handling, DEBUG mode policy, RPC
|
|
input validation) before any 1.0rc tag. Individual filed issues are parts of
|
|
it, but the review is broader than any of them.
|
|
- Decide whether docker-in-docker makes `make test-e2e` runnable in the Gitea
|
|
workflow. Extending the suite itself is tracked as
|
|
[#183](https://git.eeqj.de/sneak/AutistMask/issues/183) and
|
|
[#184](https://git.eeqj.de/sneak/AutistMask/issues/184).
|
|
- Cut 1.0.0 once the milestone is empty, then continue tagging as milestones
|
|
land.
|