check / check (push) Successful in 3m55s
The Docker build cuts each step's log off at 2 MiB. script/test ran go test -v, whose output for the whole suite passed that limit before any failure was printed, so a red build showed no failing test. Without -v, go test prints only the output of failing tests and one result line per package. -race and the 90s per-package timeout are unchanged. Model: opus-5-5