TODO.md on next still said the 1.0.0 milestone was complete and that nothing blocked the tag. The 2026-08-20 deployability audit reopened it with 11 new issues, so that status was false.
Corrects the Status and Next Step sections: the 1.0 bar is "sneak can deploy this and use it in low-volume production", not "the milestone is empty", and the milestone PR (#111) is held under a WIP: prefix until the milestone empties. Also adds #211 and #212 to the unmilestoned follow-up list.
Manager-maintained on next per #112 — issue branches do not touch this file.
Docs-only: the diff is TODO.md and nothing else, so it skips the adversarial review gate. make fmt-check exits 0.
`TODO.md` on `next` still said the 1.0.0 milestone was complete and that nothing blocked the tag. The 2026-08-20 deployability audit reopened it with 11 new issues, so that status was false.
Corrects the Status and Next Step sections: the 1.0 bar is "sneak can deploy this and use it in low-volume production", not "the milestone is empty", and the milestone PR (https://git.eeqj.de/sneak/webhooker/pulls/111) is held under a `WIP: ` prefix until the milestone empties. Also adds https://git.eeqj.de/sneak/webhooker/issues/211 and https://git.eeqj.de/sneak/webhooker/issues/212 to the unmilestoned follow-up list.
Manager-maintained on `next` per https://git.eeqj.de/sneak/webhooker/issues/112 — issue branches do not touch this file.
Docs-only: the diff is `TODO.md` and nothing else, so it skips the adversarial review gate. `make fmt-check` exits 0.
The 2026-08-20 deployability audit reopened the milestone with 11 new
issues, so the previous 'milestone complete, nothing blocks the tag'
status was false. Manager-maintained on next per #112.
clawbot
merged commit ea51612446 into next2026-08-20 05:58:03 +02:00
Blocking a user prevents them from interacting with repositories, such as opening or commenting on pull requests or issues. Learn more about blocking a user.
TODO.mdonnextstill said the 1.0.0 milestone was complete and that nothing blocked the tag. The 2026-08-20 deployability audit reopened it with 11 new issues, so that status was false.Corrects the Status and Next Step sections: the 1.0 bar is "sneak can deploy this and use it in low-volume production", not "the milestone is empty", and the milestone PR (#111) is held under a
WIP:prefix until the milestone empties. Also adds #211 and #212 to the unmilestoned follow-up list.Manager-maintained on
nextper #112 — issue branches do not touch this file.Docs-only: the diff is
TODO.mdand nothing else, so it skips the adversarial review gate.make fmt-checkexits 0.