7b4c1ae7b4 Raise script/test's per-package timeout to 90s (closes #194)
All checks were successful
check / check (push) Successful in 2m56s
`go test -timeout` is per package, so the budget has to clear the slowest
single package: internal/handlers. Measured in a cache-defeated builder
stage on the 48-core shared build host, 2026-08-18:

  16.9s                  host load 5-20, GOMAXPROCS 48
  45.9s / 47.3s / 49.0s  three runs at deliberate host load 31-73
  30.6s / 39.7s          host load 5-20, GOMAXPROCS 6 / 4
  67.3s / 97.5s          host load 5-20, GOMAXPROCS 2 / 1
  67.3s                  GOMAXPROCS 4 at deliberate host load 52-68

The old 30s budget was breached by every loaded run and by every
GOMAXPROCS at or below 6. At GOMAXPROCS 4 it failed outright on plain
33e4fa4 with no other change ("panic: test timed out after 30s"); with
90s the same run passes at 41.816s.

90s is the org-wide backstop in REPO_POLICIES.md. It holds against these
measurements: the worst case under native parallelism is 49.0s, and the
compound GOMAXPROCS-4-under-load case at 67.3s sits at 75% of it. The
one figure above 90s is GOMAXPROCS 1, a synthetic core floor rather
than a condition CI runs under.

No test is changed, skipped, shortened or desampled.