Commit Graph

2 Commits

Author SHA1 Message Date
7f27362d42 Raise script/test's per-package timeout to 180s (closes #194)
All checks were successful
check / check (push) Successful in 2m57s
`go test -timeout` is per package, so the budget has to clear the slowest
single package: internal/handlers. Measured in a cache-defeated builder
stage on the 48-core shared build host, 2026-08-18:

  16.9s                  host load 5-20, GOMAXPROCS 48
  45.9s / 47.3s / 49.0s  three runs at deliberate host load 31-73
  30.6s / 39.7s          host load 5-20, GOMAXPROCS 6 / 4
  67.3s / 97.5s          host load 5-20, GOMAXPROCS 2 / 1
  67.3s                  GOMAXPROCS 4 at deliberate host load 52-68

The old 30s budget was breached by every loaded run and by every
GOMAXPROCS at or below 6. At GOMAXPROCS 4 it failed outright on plain
33e4fa4 with no other change ("panic: test timed out after 30s"); with
180s the same run passes at 41.262s. 180s is 1.85x the worst figure
above and still bounds a hung package to a tolerable wait.

No test is changed, skipped, shortened or desampled.

#194
2026-08-18 07:24:21 +00:00
2cc8723997 scripts-to-rule-them-all (#59)
All checks were successful
check / check (push) Successful in 4s
Reviewed-on: #59
Co-authored-by: sneak <sneak@sneak.berlin>
Co-committed-by: sneak <sneak@sneak.berlin>
2026-07-07 02:14:09 +02:00