# Workflow * branch (from `main`) * do the work in Next Step * move Next Step to the top of Completed Steps * move the top item of Future Steps into Next Step * commit (`TODO.md` changes in the same commit as the work) * merge to `main` if the branch is not protected, otherwise open a PR * push # Status pre-1.0. No git tags. Runs in production-style Docker deployment, but the policy compliance branch (repo-policies-compliance, make check passing, clean tree) is unmerged to main and the CI workflow is missing. # Next Step Merge repo-policies-compliance into main (3 commits: policy files and .gitignore, Makefile targets fmt-check/check/docker/hooks, gofmt pass), then add .gitea/workflows/check.yml as a small follow-up commit so CI runs make check on main. # Completed Steps - 2026-02-22: repo policy compliance: required policy files, .gitignore update, Makefile fmt-check/check/docker/hooks targets, gofmt pass (repo-policies-compliance, unmerged) - 2026-01-01: WAL checkpointing: periodic (5s), on startup with logging, TRUNCATE mode; fixed slow queries - 2025-12-31: status page: navbar, home page with search, oldest/newest route timestamps, NULL handling in WHOIS stats; container runs as routewatch user with proper state dir - 2025-12-30: structured HTTP request logging, increased timeouts, CIDR prefix URL routing fixes, status page metrics and footer - 2025-12-29: Dockerfile multi-stage build with source archive; SQLite incremental vacuum for non-blocking space reclamation - 2025-07-27: initial RouteWatch BGP stream monitor # Future Steps - Verify main is green after the merge: make check locally and the new CI workflow passing - Review stale remote branches fix-min-time-calculation and optimize-sqlite-settings: land or delete - Clean up the tmp/ directory at the repo root: gitignore or remove