# Workflow - branch (from `next`) - do the work in Next Step - move Next Step to the top of Completed Steps - move the top item of Future Steps into Next Step - commit (`TODO.md` changes in the same commit as the work) - push - open a PR against `next` # Status pre-1.0. Work lands on `next` by PR. Open work for 1.0 is tracked on the 1.0 milestone: https://git.eeqj.de/sneak/dnswatcher/milestone/7 # Next Step 1.0 tracking issue: https://git.eeqj.de/sneak/dnswatcher/issues/66 # Future Steps - DNSSEC validation, after 1.0: https://git.eeqj.de/sneak/dnswatcher/issues/59