Files
AutistMask/TODO.md
T
clawbot 32b232db60
check / check (push) Successful in 8m15s
e2e / e2e-chrome (push) Successful in 16m6s
e2e / e2e-firefox (push) Successful in 2m55s
docs: TODO.md Next Step names open milestone work, not tagging (closes #771)
Tags and releases are the owner's call; no repo document tells him when
to tag.

Model: opus-5-5
2026-11-11 03:50:29 +01:00

2.1 KiB

Workflow

  • git pull next and cut a branch from it — one branch per issue, named issue-<N>-<slug>. Never branch from main.
  • Do the work as one commit whose title ends with (closes #N).
  • Record no finished work in this file. What landed is recorded on the tracker and in git log, where each commit title names the issue it closes.
  • Run make fmt, then make check. A feature branch may be red; next and main may not.
  • Rebase onto current next immediately before pushing — other branches land on next continuously — and re-run make check after resolving, because a clean textual merge can still break the build.
  • Push the branch and open one PR per issue with base next. Never base main.
  • An independent reviewer who did not write the change gates the merge. On a passed review the PR is squash-merged into next.
  • next is the branch for the next milestone. It is kept green and mergeable to main at any moment, without notice.
  • main receives exactly one PR per milestone, from next. Releases are tagged from main.

Status

pre-1.0, working towards the 1.0.0 milestone. The milestone is in flight on next; its next -> main PR is #388. make build produces dist/chrome/ and dist/firefox/ with DEBUG compiled off, and checks them against the build's own receipt to hold exactly the regular files and symlinks that build emitted.

The backlog lives on the Gitea tracker, which is authoritative; this file does not duplicate it. Full policy file set present. Real-browser end-to-end suites (make test-e2e for Chrome, make test-e2e-firefox for Firefox) sit alongside make check, which runs the tests, static analysis and the formatting check, and .gitea/workflows/e2e.yml runs both of them on every push.

Next Step

The open issues on the 1.0.0 milestone.

Future Steps

Only work that has no issue of its own belongs here; everything else is on the tracker.